Project Description:
Phase 1 – A 36 bed 33,500 sf. treatment centre for Alzheimer’s patients.

Phase 2 – A one storey, wood framed, 33,100 sf. addition. The facility is owned by the Czorny Alzheimer Centre Society and operated by Fraser Health.

Project Highlights:
Phase 1 of the project was LEED certified and Phase 2 had attained LEED Gold. This was achieved by the storm water management and bioswale design, water use reduction and high efficiency energy performance.

Method of Delivery: Design Build

Original Contract Value: $10.4M

LEED: LEED Gold